by Haglid Engineering | Sep 25, 2021 | Case Study
Client: Braen, a manufacturing facility and office suite in Northern NJ. Challenge: A 2,000-square-foot office suite with central heating and air-conditioning had serious Indoor Air Quality (IAQ) issues due to a manufacturing and welding facility situated...
by Haglid Engineering | Sep 25, 2021 | Case Study
Client: Bourbon BBQ “Green Restaurant” ventilation in Wyckoff, NJ. Challenge: After a major reconstruction was completed in 2011, Mike Feygin, owner of BourbonBBQ, decided it was time to make his mark on the local community beyond his delicious barbecue – he...
by Haglid Engineering | Sep 25, 2021 | Case Study
Client: Air-tight structure on Block Island, RI. Challenge: The challenge was to provide fresh air throughout an air-tight, earthen-built structure toimprove breathing and comfort for occupants. The equipment used had to reliably withstand a variety of weather...
by Haglid Engineering | Sep 25, 2021 | Case Study
Client: Bardwell House, a home stricken with a high dew point and mold in Annapolis, MD Challenge: This home’s basement suffered from the typical issues associated with combining a tight building envelope with high summer humidity anda cool basement. The...
by Haglid Engineering | Sep 25, 2021 | Case Study
Client: Devlin, world-class gymnastic training facility in the Northeast USA. Challenge: The front office areas and locker rooms of this facility had IAQ issues and lacked fresh air make-up. The main gym area trapped unpleasant odors outgassed from the many...